Article
How to handle a nonconformance
A nonconformance is when work does not meet a requirement. That might be a product that fails inspection, a skipped step or a job that does not meet what the customer agreed. Fix the immediate problem, then record what happened, find out why it happened and check the fix worked.
Record it while the details are fresh
Write down what happened, where and when, who found it and what was affected. Keep to the facts. "Three units left without the final test" is more useful than "testing problem". Note the customer, site or job if it was affected.
Deal with the immediate problem
Stop affected work, set aside any stock involved, tell the customer if needed, and fix or replace what went wrong. Record what you did and who did it.
Find the cause and decide what to change
Ask why it happened. Keep going until you find something the business can change, such as an unclear instruction, missing equipment or a step that does not fit the job. Decide what needs to change, who will do it and by when. If a procedure changes, update the current copy and tell the people who use it.
Check the fix before closing it
A second person should check that the action was completed and worked. Some changes take time to show a result, so agree when to check again. Close the record only after the check and record why it is closed.
Look for patterns
Review your records monthly or quarterly for repeat problems, sites or suppliers. A repeated problem may point to a step in the process that needs attention.
QMS is planned for January 2027. It is intended to bring nonconformances, corrective actions, owners and due dates into one place, with a follow-up check before an issue is closed. Your business remains responsible for investigating what happened and deciding what to change.
Planned for February 2027: try QMS free for 14 days.
This article provides general information only and is not legal or professional advice. Consider your own circumstances and get advice where needed.
More articles
- What an auditor may ask about document control
- How to record staff acknowledgements
- Prepare documents for document control
- Plan your audits before they are due
- Who should approve a work procedure
- How to tell field staff about changed procedures
- Corrective action that tackles the cause
- How to carry out an internal audit
- Make management reviews useful
- Managing risks and opportunities
- How to handle customer complaints
- Choosing and reviewing suppliers
- Keeping calibration records
- Do you need a quality management system?
- Policies, procedures and work instructions: what’s the difference?
- Document control for aged care and disability providers
- How often should you review your procedures?
- Moving from paper or shared drives without disrupting work
- Document control for construction and trades
- Inducting new staff on your procedures
- Quality records for manufacturers and engineering firms
- Contractor inductions: what to give contractors and what to record
- Food safety records that hold up in an inspection
- Version control without the chaos